Town Hall House Critical Pump
Infrastructure Upgrade
Client Background
Town Hall House is a prominent civic building in Sydney CBD, seeing constant public use and housing essential government and administrative functions.
The Challenge
The existing pump system was at the end of its life, creating high risks for downtime. Because the building is always active, the upgrade had to happen without shutting down services to the public or staff.
Our Solution
A staged upgrade designed for high redundancy and minimal impact on the building’s daily functions.
Fit-for-Purpose Design
Engineering a new system tailored to the building’s high-demand hydraulic needs.
Staged Execution
Replacing components in phases to ensure the building never lost water or pressure.
Smart Monitoring Integration
Installing advanced controls for clearer system oversight and easier future maintenance.
Results & Benefits
Improved hydraulic performance throughout the tower
Drastic reduction in unplanned system failures
Zero disruption to public or civic operations
Increased system redundancy for emergency scenarios
Easier accessibility for future maintenance teams
Real-time system monitoring and control
Extended lifespan of the building’s water services
Client Testimonial
“Reliability is non-negotiable for a civic building of this scale. Aquest delivered a complex upgrade smoothly and professionally.”
100% elimination of water ingress across all treated areas